AGA and Range Cooker Removal
AGA Dismantling and Removal
Full on-site strip-down of two, three and four-oven AGAs into manageable cast-iron sections, removed through standard doorways and recycled or reconditioned.

What's involved
An AGA is built in layers. The team removes the enamelled lids, hotplates and top plate first, then the front doors, side panels and front plate. Beneath sit the oven castings and the burner or element housing, packed in insulation. Older cookers often contain loose granular insulation, while newer ones use mineral wool batts. This is vacuumed out with an industrial extractor and bagged before the heavy castings are lifted out, the largest pieces weighing 50–90 kg each. A two-oven AGA usually takes three to five hours to dismantle and remove, a four-oven model longer. We protect floors with boards and dust sheets, and seal off the kitchen doorway where practical, because dismantling is dusty. The fuel supply must be disconnected beforehand by the right engineer. Afterwards the plinth area is swept and vacuumed, and the flue opening is left capped or covered for your builder or installer.
How we handle it
Send details and photos
Tell us the make, model, number of ovens, fuel type and whether it heats water or radiators. Photos of the cooker, its data badge, the flue and the route out let us plan and price accurately.
Fixed quote and plan
We confirm a single fixed price, the number of crew, how long the job should take, and which engineer is needed to disconnect the fuel supply. If the cooker may contain asbestos, we recommend testing first.
Disconnection and cooling
The cooker is switched off at least 24 hours before so the castings are cold. A Gas Safe, OFTEC or electrical engineer isolates and caps the supply, and any boiler circuit is drained.
Dismantling and removal
The team protects floors, strips the cooker into sections, vacuums insulation, and carries the castings out. A typical two-oven AGA takes three to five hours from start to clean-up.
Clean-up and recycling
The alcove is swept and vacuumed and the flue covered. Cast iron is recycled or sent for reconditioning, and you receive a waste transfer note for everything removed.
Price guide
AGA and range cooker removal is priced on the cooker's size and weight, how much dismantling it needs, the fuel type and the access. A modern range cooker is a short job. A four-oven cast-iron AGA with a boiler and an awkward route can take most of a day. Reconditionable cookers may lower the price.
- Two-oven AGA dismantle and removal: £350–£550. Full on-site strip-down, insulation removal, clean-up and cast-iron recycling.
- Modern range cooker, 90–110cm: £110–£180. Three-person team with skates and trolleys; fuel supply must be capped first.
- Asbestos sampling before removal: from £150. Recommended for older cookers or flues of unknown history before any dismantling.
Questions about aga dismantling and removal
How long does AGA removal take?
A two-oven AGA usually takes three to five hours to dismantle, clear and remove. A four-oven model, a Rayburn with a boiler, or a cooker with a long or awkward route can take most of a day. The cooker must be switched off at least 24 hours beforehand so the cast iron is cold enough to handle.
What should I do to prepare for AGA removal?
Switch the cooker off at least a day before, arrange or confirm the fuel disconnection, and clear the kitchen of anything fragile. Empty the warming oven and remove any rails or utensils hung on the cooker. Make sure there is parking close to the door for a van, and tell us about steps or narrow corridors on the route.
Other services
Rayburn, Esse and Stanley Removal
Removal of cast-iron range cookers with boilers or back boilers, including those linked to central heating and hot water systems.
Modern Range Cooker Removal
Removal of 90cm to 150cm dual-fuel, gas and electric range cookers such as Rangemaster, Falcon, Mercury and Lacanche, using extra crew and specialist trolleys.
Flue and Fuel Line Making-Safe Coordination
Arranging the right qualified engineer for gas, oil, LPG or solid-fuel cookers so the supply and flue are made safe before dismantling starts.
Asbestos-Aware Removal of Older Cookers
Safe handling of older heat-storage cookers where rope seals, gaskets, flue pipes or insulation may contain asbestos, with testing arranged before work starts.
Reconditioning Assessment and Cast-Iron Recycling
Advice on whether your old cooker could be reconditioned and resold, and responsible recycling of cast iron, steel and enamel when it cannot.
AGA Dismantling and Removal near you
Get a free aga and range cooker removal quote
Tell us what you need and we'll come back with a clear price.
Request a quote